The phase, planning and organisation
In 2006 and 2007 phase 3 will be constructed. This phase includes 8 large classrooms, 4 teachers’ rooms and toilets. The classrooms are bigger than those of phase 1 and 2 and meet all regulations and standards as stipulated by the Chinese government. Part of the regulations resulted in extra measures in the field of energy reduction. Measures such as a different construction of the walls, other windows and glazing and another heating system.
These energy saving measures are financed by the prize money of theBarbara Ohmann prizethat was won by the Arentheem College from Arnhem.